Construction Progress Round-up – October 2026

As we move into the final months of the year, Mosaic Construction continues to advance projects across key stages of the delivery journey. With Isabel in Burleigh Heads now reaching settlement, we are preparing to welcome residents to their new homes, marking the culmination of years of planning, design and craftsmanship. Meanwhile, construction activity continues to build across our Brisbane and Gold Coast portfolio, including at The Riversdale in South Brisbane, where foundation works and piling activities are now progressing onsite, laying the groundwork for this landmark riverside residences to come.

Brisbane

The Bedford by Mosaic | Kangaroo Point

Address: 16-30 Prospect Street, Kangaroo Point

Apartments: 141, 2- and 3-bedroom apartments and penthouse-style Sky Homes over 17 levels

Builder: Mosaic Construction

Design Partner: BDA Architecture

Sales Status: Over 90% Sold – Act Now

September marked another month of strong progress at The Bedford, with construction continuing to advance across the structure, façade and interiors. During the month, concrete slab pours were completed to Levels 4 and 5, while structural works progressed to Level 6. Residential construction commenced on Level 1 with services and internal wall installations underway, signalling the transition from structure to homes. Meanwhile, façade works gained momentum across the lower levels, with glazing, external finishes and waterproofing progressing as the building’s architectural form continues to emerge.

The Carter by Mosaic | Kangaroo Point

Address: 73-83 Linton Street, Kangaroo Point

Apartments: 125, 2- & 3-bedroom residences & sky homes over 22 levels

Builder: Mosaic Construction

Design Partner: BDA Architecture

Sales Status: Over 90% Sold – Act Now

Mosaic Construction maintains strong momentum across The Carter with key rooftop amenity areas continuing to take shape. Exterior façade glazing progressed to Level 20 and party wall construction reached Level 19. Internally, waterproofing, tiling, joinery, flooring and services installation advanced steadily through the residences, with Level 9 homes entering Mosaic’s quality assurance process. As completion draws closer, momentum continues to build across all aspects of the project.

 

CLICK TO LEARN MORE ABOUT THE CARTER

The Riversdale by Mosaic | South Brisbane

Address: 91 Montague Road, South Brisbane

Apartments: 213, 2- & 3-bedroom residences & sky homes over 39 levels

Builder: Mosaic Construction

Design Partner: Bureau Proberts

Sales Status: Over 65% Sold

Construction is now officially underway at The Riversdale with foundation piling commencing across the site. During the month, the piling platform and southern guide wall were completed, enabling the mobilisation of specialised equipment, including a 100-tonne piling rig. Given the depth and complexity of the foundations, specialised construction techniques and drilling technology are being used to support piling works and ensure stability throughout the process. Over the coming months, more than 3,500m³ of concrete will be used to create the foundations that will anchor the building. While much of this activity takes place below ground, it represents one of the most important phases of construction forming the critical structure that will support the 39-level riverfront tower.

 

CLICK TO LEARN MORE ABOUT THE RIVERSDALE

Gold Coast

Madeline by Mosaic | Broadbeach

Address: 22 Mary Avenue, Broadbeach

Apartments: 60, half- and full-floor residences and Sky Homes over 39 levels

Builder: Mosaic Construction

Design Partner: Fraser and Partners

Sales Status: Over 80% Sold

Madeline has reached a defining milestone, with construction now advancing beyond the podium levels and into the collection of private residences that will soon shape this landmark Broadbeach address. Throughout September, Madeline continued its upward progression, with suspended slab works reaching Level 7, the central core advancing to Level 11 and the stair structure extending to Level 8. Behind the scenes, essential services works commenced across the lower levels, while the tower crane was jumped to Level 22 to support the next phase of vertical construction.

 

CLICK TO LEARN MORE ABOUT MADELINE

Sophia by Mosaic | Palm Beach

Address: 1357 Gold Coast Highway, Palm Beach

Apartments: 32 beautifully appointed 2- and 3-bedroom residences, sub-penthouses, and penthouses over nine levels.

Builder: Mosaic Construction

Design Partner: Bureau Proberts

Sales Status:  Limited Opportunities Remain – Act Quickly

Mosaic Construction have advanced Sophia to Level 8 and, weather permitting, is now only week’s away from achieving the significant milestone of structural top-out. Across September they delivered structural works through Levels 7 and 8, including slab pours, lift core construction, stair installation and precast panel placement. Residential works progressed to Level 4 with waterproofing and glazing underway, while internal fit-out activities advanced across the lower levels. The swimming pool and spa structures were also completed, alongside preparatory lift works.

 

CLICK TO LEARN MORE ABOUT SOPHIA

Josephine by Mosaic | Burleigh Heads

Address: 166 The Esplanade, Burleigh Heads

Apartments: 30 half- and full-floor residences across 18 levels.

Builder: Mosaic Construction

Design Partner: EMK Architects

Sales Status: Over 85% Sold – Act Now

September saw strong momentum onsite as key foundation works continued to advance ahead of the project’s next major milestone, basement excavation. Secant piling was completed around the site perimeter, alongside the installation of raft piles and plunge columns, establishing the structural foundations for the building. Crane foundations were also finalised during the month, marking another significant step forward as the project prepares for the next phase of construction.

 

CLICK TO LEARN MORE ABOUT JOSEPHINE