Construction Progress Round-up – November 2025

While the weather has been unpredictable of late, Mosaic Construction continues to maintain strong progress across all sites in Brisbane and the Gold Coast. October saw notable structural progress at The Carter in Kangaroo Point, and Isabel in Burleigh Heads with Sophia at Palm Beach transitioning from foundational activity to early structural preparations. Essential service connections to establish and prepare our projects for their next phase of construction continued at The Bedford in Kangaroo Point and Madeline in Broadbeach. During November, we will be excited to see Lily enter the final stages of construction with an unmistakable energy on site as they move confidently toward completion next month.

Brisbane

The Bedford by Mosaic | Kangaroo Point

Address: 16-30 Prospect Street, Kangaroo Point

Apartments: 128, 2- and 3-bedroom apartments and penthouse-style Skyhomes over 16 levels

Builder: Mosaic Construction

Design Partner: BDA Architecture

Sales Status: Over 90% Sold – Act Now

Excavation is advancing at The Bedford with the 70-tonne excavator hard at work progressing the basement down four levels. During October and continuing through November, basement walls are being reinforced, and essential service works are connecting in the sewer pipes, electrical conduits, water lines and the hydrant system. As bulk excavation nears completion in mid-November, weather permitting, focus will shift to detailed excavation and preparation for basement footings.

CLICK TO LEARN MORE ABOUT THE BEDFORD

The Carter by Mosaic | Kangaroo Point

Address: 73-83 Linton Street, Kangaroo Point

Apartments: 125, 2- & 3-bedroom residences & sky homes over 22 levels

Builder: Mosaic Construction

Design Partner: BDA Architecture

Sales Status: Over 85% Sold – Act Now

The Carter continues to maintain substantial progress on site. October saw notable structural progress with core walls reaching Level 5 and slab pours advancing to Level 3. During November, The Carter will continue to rise as the building core extends to Level 7, while two concrete pours are scheduled to complete the Level 4 slab, weather permitting. Following this, Level 5 formwork will commence, and internal infrastructure will begin, marking an exciting transition toward future fit-out stages.

CLICK TO LEARN MORE ABOUT THE CARTER

 

Gold Coast

Isabel by Mosaic | Burleigh Heads

Address: 96 The Esplanade, Burleigh Heads

Apartments: 28 half and full-floor residences and Sky Homes across 16 levels and two split-level penthouses, each with private pool.

Builder: Mosaic Construction

Design Partner: Koichi Takada Architects

Sales Status: SOLD OUT

Isabel is marking another solid step upward with glazing installed on Levels 9 and 10, and now underway on Level 11, a clear sign of momentum across both the facade and interiors. Concrete slabs were also poured for Level 12 through to 14. Looking ahead, November will see Isabel edge closer to full height with slab pours scheduled for Levels 15 and 16 and formwork commencing on Level 17—just one level shy of topping out.

CLICK TO LEARN MORE ABOUT ISABEL

Madeline by Mosaic | Broadbeach

Address: 22 Mary Avenue, Broadbeach

Apartments: 59, half- and full-floor residences and Sky Homes over 37 levels

Builder: Mosaic Construction

Design Partner: Fraser and Partners

Sales Status: Over 70% Sold

Mosaic Construction are advancing key underground works while focusing on major structural progress. October marked a major milestone with the completion of piling works—the first foundational step in bringing the building structure to life. Looking ahead, November will see Madeline enter another exciting phase of transformation with bulk excavation to commence.

CLICK TO LEARN MORE ABOUT MADELINE

Lily by Mosaic | Broadbeach

Address: 4 Rosewood Avenue, Broadbeach

Apartments: 98, 2- and 3-bedroom residences and Sky Homes over 29 levels

Builder: Mosaic Construction

Design Partner: Plus Architecture

Sales Status: SOLD OUT

With construction now entering its final stages, the energy on site is unmistakable. Mosaic Construction has shifted focus from major structural works to the finer details—the elements that elevate the living experience and really bring the vision of Lily to life. The ground floor lobby is sheeted with joinery installed and the Level 1 residential amenities are complete, ready to welcome Residents. On the rooftop, the Level 32 Residents’ Lounge, dining area, kitchen and workspace have had joinery installed, offering a glimpse of the elevated lifestyle to come.

CLICK TO LEARN MORE ABOUT LILY

Sophia by Mosaic | Palm Beach

Address: 1357 Gold Coast Highway, Palm Beach

Apartments: 32 beautifully appointed 2- and 3-bedroom residences, sub-penthouses, and penthouses over nine levels.

Builder: Mosaic Construction

Design Partner: Bureau Proberts

Sales Status:  Now Selling – Register for Exclusive Access

October marked a steady shift from foundational activity to early structural preparation, including the installation of steel retention plates to reinforce the excavation and the finalisation of the capping beam—securing the site and enabling future basement construction. External service connections along the Gold Coast Highway have now been completed and looking ahead, November will see the installation of de-watering wells progress on site, establishing the stable, dry conditions required for the next phase.