Construction Progress Round-up – March 2026

March marks a standout month of progress for Mosaic Construction, underscored by the arrival of new tower cranes at Madeline in Broadbeach and Sophia in Palm Beach. Early construction activity is also underway at Josephine, our latest ultra‑luxury address on The Esplanade in Burleigh Heads, while our Brisbane teams maintain strong upward momentum at The Carter and The Bedford in Kangaroo Point.

Brisbane

The Bedford by Mosaic | Kangaroo Point

Address: 16-30 Prospect Street, Kangaroo Point

Apartments: 128, 2- and 3-bedroom apartments and penthouse-style Skyhomes over 17 levels

Builder: Mosaic Construction

Design Partner: BDA Architecture

Sales Status: Over 90% Sold – Act Now

The Formwork–Reinforcement–Pour (FRP) structural cycle continues to shape the basement levels of The Bedford — a significant milestone in the structure’s upward progression. Weather permitting, March will see continued structural advancement moving from Basement Level 1 through to Ground Floor. In other notable progress, a second crane will be installed on site to enhance coverage across multiple work zones, increase lifting capacity, and reduce wait times. We’re also pleased to replace the first crane’s generator with a Green Energy battery system to deliver a cleaner, quieter, and more sustainable power source that minimises community disruption wherever possible.

CLICK TO LEARN MORE ABOUT THE BEDFORD

 

The Carter by Mosaic | Kangaroo Point

Address: 73-83 Linton Street, Kangaroo Point

Apartments: 125, 2- & 3-bedroom residences & sky homes over 22 levels

Builder: Mosaic Construction

Design Partner: BDA Architecture

Sales Status: 90% Sold – Act Now

Through a series of well-timed pours and coordinated works, The Carter’s structure continues to progress upward with Level 8 and 9 formed and poured and the core advancing to Level 12. Facade works progressed steadily through the lower levels, with glazing installed across Levels 2 through 5. Looking ahead to March, weather permitting, a continued steady, vertical progression of the building will plan for the core rising to Level 15, alongside the forming and pouring to Levels 10 and 11.

CLICK TO LEARN MORE ABOUT THE CARTER

 

 

Gold Coast

Isabel by Mosaic | Burleigh Heads

Address: 96 The Esplanade, Burleigh Heads

Apartments: 28 half and full-floor residences and Sky Homes across 16 levels and two split-level penthouses, each with private pool.

Builder: Mosaic Construction

Design Partner: Koichi Takada Architects

Sales Status: SOLD OUT

With the tower now standing proudly at its full height, February saw Mosaic Construction continue to make solid progress across key structural and internal stages of Isabel’s build. Roof services and waterproofing advanced on Level 19, and glazing installation on Level 18 was completed. Looking ahead, March brings an important milestone: the commencement of scaffold removal from the roof down to Level 17. As this gets underway, Isabel’s elegant architectural form will progressively come into view, marking a clear and anticipated transition into the advanced stages of construction.

CLICK TO LEARN MORE ABOUT ISABEL

 

Madeline by Mosaic | Broadbeach

Address: 22 Mary Avenue, Broadbeach

Apartments: 59, half- and full-floor residences and Sky Homes over 37 levels

Builder: Mosaic Construction

Design Partner: Fraser and Partners

Sales Status: Over 80% Sold

February marked a pivotal milestone for Madeline with the installation of its tower crane, now standing proudly on the Broadbeach skyline. Throughout March, the team will undertake the final concrete pour for Basement Level 3 before commencing the Formwork–Reinforcement–Pour (FRP) cycle to construct the basement slabs. Weather permitting, Mosaic Construction will continue to progress through this program in March, completing the FRP cycle across Basement Levels 3 and 2.

CLICK TO LEARN MORE ABOUT MADELINE

Sophia by Mosaic | Palm Beach

Address: 1357 Gold Coast Highway, Palm Beach

Apartments: 32 beautifully appointed 2- and 3-bedroom residences, sub-penthouses, and penthouses over nine levels.

Builder: Mosaic Construction

Design Partner: Bureau Proberts

Sales Status:  Limited Opportunities Remain – Act Quickly

Sophia’s tower crane now rises proudly above Palm Beach — a defining visual milestone that marks a clear shift into the next phase of on-site activity as Mosaic Construction prepares to move above ground. February saw steady progress across the below-ground works and the gantry installation was also finalised. Weather permitting, March is expected to carry this momentum forward, with Mosaic Construction targeting completion of the basement structure program.

CLICK TO LEARN MORE ABOUT SOPHIA

Josephine by Mosaic | Burleigh Heads

Address: 166 The Esplanade, Burleigh Heads

Apartments: 30 half- and full-floor residences across 18 levels.

Builder: Mosaic Construction

Design Partner: EMK Architects

Sales Status:  80% Sold – Act Now

Thanks to the exceptional ongoing sales momentum, Josephine is now 80% sold — a performance that continues to exceed expectations and advance Josephine’s construction program. March will become a major milestone month, with Mosaic Construction finalising the key preparations required to move into the formal construction phase. Over the coming weeks, this will include the permanent disconnection and removal of existing services, soil testing will take place, and once these preparations are complete, and weather permitting, the team will transition into demolition of the existing building. As activity continues to build, we will include initial on-site imagery as we enter this next, exciting phase of the journey.