It's hard to believe we are already nearing the middle of 2022. We are happy that the weather has finally cleared up and we are starting to see some exciting milestones being achieved across all Mosaic projects. Continue reading our latest construction progress round-up.
Address: 36 Sylvan Road, Toowong
Apartments: 63
Builder: Mosaic Construction
Completion: Late 2022
Sales Status: Sold out
Mosaic Construction continues to track to programme, with the level 2 concrete slab poured. During June, the team will be working towards completing the level 3 slab pour, meaning we won’t be far from the official halfway mark.
CLICK TO LEARN MORE ABOUT KENSINGTON
Address: 88 Duporth Ave, Maroochydore
Apartments: An ultra-luxury collection of 15 half and full-floor penthouse-style residences.
Builder: Mosaic Construction
Completion: Late 2023
Sales Status: Sold out
While the ongoing inclement weather has naturally created some challenges, Mosaic Construction continues to progress piling works around the site’s perimeter as quickly and safely as possible. Given the basement’s proximity to the river, this is an incredibly critical task that requires favourable weather conditions to complete. These works will continue this month as the team works towards the official commencement of basement excavation.
CLICK TO LEARN MORE ABOUT LORIENT
Address: 152 Toohey Street, East Brisbane
Apartments: 122 across two boutique buildings connected by an innovative Sky Bridge
Builder: Mosaic Construction
Completion: Mid-2022
Sales Status: Sold out
Mosaic Construction is pulling out all stops during this last critical phase before settlement. It’s a veritable hive of activity as all hands are on deck. Like Mosaic Construction, Mosaic Bespoke Living, and the Customer Experience team are getting ready to welcome Residents home. Personal inspections are progressing, and the feedback continues to be very positive.
CLICK TO LEARN MORE ABOUT THE SINCLAIR
Address: 15 Archer Street, Toowong
Apartments: 66
Builder: Mosaic Construction
Completion: Early-2022
Sales Status: Sold out
Mosaic Construction continues to track to programme, with the team currently prepping for the level 11 concrete slab pour. Glazing installation is also moving up the building, having reached level six, and plasterboard installation is at level five.
CLICK TO LEARN MORE ABOUT THE PATTERSON
Address: 4-6 Second Avenue, Burleigh Heads
Apartments: 47
Builder: Mosaic Construction
Completion: Early-2022
Sales Status: Sold out
Mosaic Construction has achieved several exciting milestones. Construction continues with the concrete slab pours for each level. During June, the team will complete up to level 11, meaning we are close to reaching the home stretch to building top out.
CLICK TO LEARN MORE ABOUT GRACE
Address: Peerless Ave, Mermaid Beach
Apartments: 85
Builder: Hutchinson Builders
Completion: Late 2023
Sales Status: Sold out
Hutchinson Builders will soon complete the pool structure on the podium level. Aside from the pool, this level will feature a range of premium amenities for you to enjoy, including a spa, sauna, steam room, and dining and seating areas.
The central lift and stair core structure have reached level five, and the precast concrete panels are installed to level one in preparation for the next level’s slab pour.
Below the ground, basement works are progressing well, with services rough-in underway (i.e. plumbing and electricity connections).
CLICK TO LEARN MORE ABOUT DAWN
Address: 29 Finney Road, Indooroopilly
Apartments: 141 over two boutique buildings
Builder: Mosaic Construction
Completion: Early 2024
Sales Status: Sold out
While the ongoing inclement weather has naturally created some challenges, Mosaic Construction continues to progress piling works around the site’s perimeter as quickly and safely as possible. In good news, piling works are now complete to Witton Two and continuing to Witton One.
The vegetation rehabilitation project is also continuing unimpeded.
CLICK TO LEARN MORE ABOUT THE WITTON
Address: 4 First Ave, Burleigh Heads
Apartments: 34 2 – and 3-bedroom apartments and sub-penthouses over 13 levels
Builder: Mosaic Construction
Completion: Late 2023
Sales Status: Sold out
Mosaic Construction continues to progress piling works around the site’s perimeter as quickly and safely as possible.
These works will continue this month as the team works towards the official commencement of basement excavation. At the same time, civil connections (i.e. water and electricity) will also get underway.
CLICK TO LEARN MORE ABOUT AUGUSTA
Address: 42 The Esplanade, Burleigh Heads
Apartments: 9 full-floor Masterpiece Series residences over 9 levels
Builder: Mosaic Construction
Completion: Late 2023
Sales Status: Sold Out
Given they are adjoining sites, Florence by Mosaic and Augusta by Mosaic are being built at the same time. Per the above, our team is continuing with piling works around the site perimeter.
CLICK TO LEARN MORE ABOUT FLORENCE
Address: 1 Surf Street, Bilinga
Apartments: 13, 3-bedroom Masterpiece Series residences over seven levels
Builder: Mosaic Construction
Completion: Mid-Late 2023
Sales Status: Sold Out
We have officially received Development Approval for Bianca. It won’t be long before this breathtaking, ultra-luxury Masterpiece Series address starts to become a reality.
Bianca’s incredible sales performance enabled us to expedite the start date for key pre-construction activities, including demolishing the existing structures and clearing the site.
Further, a significant upgrade to a 16m portion of the existing sea wall on the beachfront of 1 Surf Street is underway. This will ensure it meets the standards outlined in the Gold Coast City Plan and Land Development Guidelines. Ultimately, it will help provide safety to local residents for generations to come.