8 April 2026
Mosaic Construction closed the first quarter of 2026 achieving significant milestones across Brisbane and the Gold Coast — from the gradual unveiling of Isabel and early momentum at Josephine, both in Burleigh Heads, to rising forms in Kangaroo Point at The Carter and The Bedford.
Brisbane
The Bedford by Mosaic | Kangaroo Point

Address: 16-30 Prospect Street, Kangaroo Point
Apartments: 128, 2- and 3-bedroom apartments and penthouse-style Skyhomes over 17 levels
Builder: Mosaic Construction
Design Partner: BDA Architecture
Sales Status: Over 90% Sold – Act Now
The Bedford continues to progress through the Formwork–Reinforcement–Pour (FRP) cycle, with the building steadily transitioning out of the basement phase. During March, precast concrete panels were installed from Basement Level 1 toward Ground Floor, alongside suspended slab pours across Basement Level 2 Mezzanine, Basement Level 1 and Ground Floor decks and ramps. A key milestone was the arrival and staged installation of the second tower crane. In April, basement works will be finalised, with the building beginning to emerge above ground. Structural works will continue to Ground Floor and Level 1, external scaffolding will commence at podium level, and the new crane will enhance site efficiency once commissioned.
CLICK TO LEARN MORE ABOUT THE BEDFORD


The Carter by Mosaic | Kangaroo Point
![]()
Address: 73-83 Linton Street, Kangaroo Point
Apartments: 125, 2- & 3-bedroom residences & sky homes over 22 levels
Builder: Mosaic Construction
Design Partner: BDA Architecture
Sales Status: Over 90% Sold – Act Now
The Carter continues to progress confidently through its upper structural stages, now well above ground. In March, the building advanced beyond its midpoint, with the core constructed to Level 15 and concrete pours completed on Levels 10 and 11. Façade works progressed concurrently, with glazing installed to Levels 7 and 8, enhancing the building’s architectural definition. Internal works also moved upward, with party wall framing commencing at Level 7. A key services milestone was achieved with completion of the Energex padmount site. In the coming month, the core is scheduled to reach Level 17, with slab pours to Levels 12–14, further façade installation, and continued progression of internal framing.


Gold Coast
Isabel by Mosaic | Burleigh Heads

Address: 96 The Esplanade, Burleigh Heads
Apartments: 28 half and full-floor residences and Sky Homes across 16 levels and two split-level penthouses, each with private pool.
Builder: Mosaic Construction
Design Partner: Koichi Takada Architects
Sales Status: SOLD OUT
CLICK TO LEARN MORE ABOUT ISABEL


Madeline by Mosaic | Broadbeach

Address: 22 Mary Avenue, Broadbeach
Apartments: 59, half- and full-floor residences and Sky Homes over 37 levels
Builder: Mosaic Construction
Design Partner: Fraser and Partners
Sales Status: Over 80% Sold
Madeline’s basement works continue to progress through a well‑sequenced below‑ground program, laying the groundwork for the structure above. In March, the Basement 3 raft pour was completed, marking a critical structural milestone. At the same time, the Formwork–Reinforcement–Pour (FRP) cycle advanced through the core walls from Basement 3 to Basement 2. A key milestone was the installation of the self‑climbing jump form system, supporting future vertical construction. In the coming period, works will focus on pouring the Basement 2 suspended slab, continued shotcreting, precast column installation, and progressing core walls up to Basement 1.
CLICK TO LEARN MORE ABOUT MADELINE


Sophia by Mosaic | Palm Beach

Address: 1357 Gold Coast Highway, Palm Beach
Apartments: 32 beautifully appointed 2- and 3-bedroom residences, sub-penthouses, and penthouses over nine levels.
Builder: Mosaic Construction
Design Partner: Bureau Proberts
Sales Status: Limited Opportunities Remain – Act Quickly
Sophia is now well established within the Formwork–Reinforcement–Pour (FRP) cycle, guiding the delivery of core concrete elements. Key basement milestones achieved include completion of the Basement 2 raft slab, Basement 2 lift core, fire stairs, and the ramp linking Basement 2 and Basement 1. Shotcrete works to Basement 2 are nearing completion, alongside successful pours to Basement 1. Throughout April, FRP activities will continue within Basement 1, retention struts will be progressively removed, and early works will commence to support the transition to the first ground floor pours.


Josephine by Mosaic | Burleigh Heads

Address: 166 The Esplanade, Burleigh Heads
Apartments: 30 half- and full-floor residences across 18 levels.
Builder: Mosaic Construction
Design Partner: EMK Architects
Sales Status: Over 85% Sold – Act Now
Josephine continues to track strongly toward a complete sell‑out, with Mosaic Construction making steady progress on early site works. During March, all existing services and infrastructure across the site were permanently disconnected, removed, and decommissioned, including utilities servicing the former building. With these works successfully completed and the site secured, Mosaic has transitioned into full demolition of the existing structure. Demolition activities are now underway and scheduled to continue throughout April, clearing the site in readiness for the next phase of construction.