Across South East Queensland, progress is palpable as we advance on 10 dynamic developments, set to introduce over 750 new homes in the next two years. With exciting completions on the horizon in the coming months, each project epitomises innovation, quality materials and craftsmanship, and a promises an effortless lifestyle. Mosaic Construction has been busy making excellent strides over the past month as highlighted in our latest construction round-up.

Sunshine Coast

Cotton Tree by Mosaic | Cotton Tree

Address: 17 The Esplanade, Cotton Tree

Apartments: Two boutique buildings featuring 8 full-floor, ultra-luxurious 3-bedroom residences and 33 spacious 2- and 3-bedroom residences.

Builder: Mosaic Construction

Design Partner: Bureau Proberts

Sales Status: SOLD OUT

Mosaic Construction made excellent progress on basement works last month.

If all goes according to plan and weather conditions remain favourable, the team will pour the concrete slabs for Building 1 (The Esplanade) Level 4 and Basement 1 this month.

Once the Building 1 tower reaches a designated height, internal works, including glazing installation, will get underway. And it won’t be long before we start to see Building 2 (Memorial Avenue) begin its above-ground ascent.

CLICK TO LEARN MORE ABOUT COTTON TREE

Brisbane

The Manning by Mosaic | Milton

Address: 33 Railway Tce, Milton

Apartments: 113, 2- and 3-bedroom apartments over 22 levels

Builder: Mosaic Construction

Design Partner: BDA Architecture

Sales Status: NEAR SELLOUT – ACT FAST

The team has successfully completed the concrete slab pours for both Levels 4 and 5 and has commenced preparation for Level 6. Due to the size, these took place over two pours.

This month Mosaic Construction is targeting to complete both concrete slab pours for Level 6 and advance formwork for Level 7, weather permitting.

CLICK TO LEARN MORE ABOUT THE MANNING

The Prescott by Mosaic | Toowong

Address: 28 Lissner Street, Toowong

Apartments: 101, 2- and 3-bedroom apartments and Masterpiece Skyhomes over 14 levels

Builder: Mosaic Construction

Design Partner: DKO

Sales Status: SOLD OUT

Mosaic Construction successfully completed the concrete slab pours for both Levels 3 and 4 and commenced preparation for Level 5 last month.

In May, the team aims to close out both concrete slab pours for Levels 5 and 6 and advance formwork for Level 7.

Internal spaces will also start to come to life this month as the team starts roughing in high-level services and wall framing on the lower levels.

CLICK TO LEARN MORE ABOUT THE PRESCOTT

The Witton by Mosaic | Indooroopilly

Address: 29 Finney Road, Indooroopilly

Apartments: 141 over two boutique buildings

Builder: Mosaic Construction

Design Partner: Rothelowman

Sales Status: SOLD OUT

In April, Mosaic Construction finalised the installation of The Witton One’s distinctive rooftop ‘crown’ structure as planned and advanced works to the recreational space, including forming the pool shell. They are now making final preparations to imminently commence The Witton One’s scaffold removal, progressively unveiling its elegant final form.

At The Witton One, glazing is being installed on Level 15, flooring is underway on Level 9, balcony balustrades are fitted on all levels, and kitchen fit-outs have kicked off on the lower levels. Glazing is all but complete at The Witton Two, and balustrade installation is set for this month, along with wall sheeting to Level 2.

If all goes according to plan and weather permits, Mosaic Construction will fill the pool with over 100,000 litres of water, and the crown will have landscaping wires installed, ready for climbing plants.

CLICK TO LEARN MORE ABOUT THE WITTON

The Mowbray by Mosaic | East Brisbane

Address: 73 Northcote Street, East Brisbane

Apartments: 81, 2- and 3-bedroom residences over 8 levels

Builder: Mosaic Construction

Design Partner: DKO Architecture

Sales Status: SOLD OUT

Mosaic Construction reached the crucial stage of structural top-out, signalling a major step forward in our construction journey.

Internally, glazing installation is now at Level 6, while wall and ceiling sheeting, setting, and sanding are at Level 5. In more good news, painting has started at the lowest levels.

Following structural top-out, Mosaic Construction kicked off work on The Mowbray’s rooftop recreation space, shaping and waterproofing the block planter beds and making the necessary plans to start forming the pool this month.

CLICK TO LEARN MORE ABOUT THE MOWBRAY

Gold Coast

Isabel by Mosaic | Broadbeach

Address: 96 The Esplanade, Burleigh Heads

Apartments: 28 half and full-floor residences and Sky Homes across 16 levels and two split-level penthouses, each with private pool.

Builder: Mosaic Construction

Design Partner: Koichi Takada Architects

Sales Status: NEAR SELLOUT  – ACT NOW

The capping beam installation was completed on schedule and,  following this, Mosaic Construction began setting up the dewatering plant to prepare for bulk excavation.

Looking ahead, if all goes according to plan and weather conditions remain favourable, Mosaic Construction will start basement excavation after the dewatering plant setup is completed.

CLICK TO LEARN MORE ABOUT ISABEL

Augusta by Mosaic | Burleigh Heads

Address: 4 First Ave, Burleigh Heads

Apartments: 34 2 – and 3-bedroom apartments and sub-penthouses over 13 levels

Builder: Mosaic Construction

Design Partner: BDA Architecture

Sales Status: SOLD OUT

Mosaic Construction is progressing with Augusta’s scaffold drop, gradually unveiling the building’s elegant form. This significant milestone will be completed in May if everything goes as planned.

Internally, wall sheeting and setting have reached Level 13, timber flooring has been laid up to Level 8, and stone benchtop installations are simultaneously advancing to multiple levels. Final wall and ceiling painting is also underway at Level 5, with blind fitting at Level 4.

Mosaic Construction will maintain its momentum this month during the last critical stages, achieving full completion of individual apartments on the lower levels and commencing the locking up of each.

CLICK TO LEARN MORE ABOUT AUGUSTA 

Florence by Mosaic | Burleigh Heads

Address: 42 The Esplanade, Burleigh Heads

Apartments: 9 full-floor Masterpiece Series residences over 9 levels

Builder: Mosaic Construction

Design Partner: Bureau Proberts

Sales Status: SOLD OUT

Following Augusta’s update above, the removal of scaffolding is also progressing at Florence.

External rendering is finished up to Level 9, where the installation of feature balcony soffits, wall framing, and sheeting are also finalised. Wall and ceiling painting is advancing to Levels 2 to 7, while windows are installed to Level 1.

Mosaic Construction will maintain its momentum this month with a packed schedule of tasks, including ongoing fitting of external feature screens, advancement in internal tiling, and initiation of stone benchtop installation on the lower floors.

CLICK TO LEARN MORE ABOUT FLORENCE

Lily by Mosaic | Broadbeach

Address: 4 Rosewood Avenue, Broadbeach

Apartments: 98, 2- and 3-bedroom residences and Sky Homes over 29 levels

Builder: Mosaic Construction

Design Partner: Plus Architecture

Sales Status: NEAR SELLOUT – ACT NOW

Last month, Mosaic Construction completed the Ground-Level slab pour and progressed works for the Level 1 slab, which, if all goes according to plan, will be completed this month.

By the end of May, the team aims to have the scaffold fully installed and extended to the third floor and to finalise works for the Level 2 concrete slab pour.

CLICK TO LEARN MORE ABOUT LILY

Marella by Mosaic | Broadbeach

Address: 146 Surf Parade, Broadbeach

Apartments: 100, 2- and 3-bedroom residences over thirty levels

Builder: Mosaic Construction

Design Partner: Plus Architecture

Sales Status: SOLD OUT

Marella’s tower structure has ascended two additional levels, now proudly standing at 17, while the jump form reached Level 21. Glazing is finalised to Level 12 and now advancing to Level 13.

Wall framing progresses steadily to Level 12, services rough-in currently stands at Level 11, and wall and ceiling sheeting are underway at Level 10. Internal wall painting, balcony, and wet area waterproofing have surged ahead by three floors in April, now at Level 8.

With favourable weather and successful execution, the team aims to reach Level 19 of the tower structure in May.