Project updates | 3 minutes

Construction Progress Round-up – August 2023

Mosaic Property
02/08/23

As we move into August, we are thrilled to celebrate the structural top-out of multiple buildings, a momentous achievement delivered by our award-winning construction team. Each of our 13 active building sites continues to see exciting progress across the board, with some, like Dawn by Mosaic in Mermaid Beach, seeing their completion firmly on the horizon.

Lily by Mosaic | Broadbeach

Address: 4 Rosewood Avenue, Broadbeach

Apartments: 98, 2- and 3-bedroom residences and Sky Homes over 29 levels

Builder: Mosaic Construction

Sales Status: SELLING FAST – ENQUIRE NOW

Mosaic Construction made fantastic progress last month, having demolished the existing structures and cleared Lily’s site. The team is now looking to commence piling works, which will create a safe and stable foundation for construction. August will also see the arrangement of essential utilities and services for the building, in preparation for further works.

CLICK TO LEARN MORE ABOUT LILY

 

Cotton Tree by Mosaic | Cotton Tree

Address: 17 The Esplanade, Cotton Tree

Apartments: Two boutique buildings featuring 8 full-floor, ultra-luxurious 3-bedroom residences and 33 spacious 2- and 3-bedroom residences.

Builder: Mosaic Construction

Sales Status: NEARING SELLOUT – ONE REMAINING

The team continues to make solid strides in Cotton Tree’s building program, completing piling works to Building 1 last month and looking to advance to Building 2 in August, weather permitting. Mosaic Construction will also commence the inground hydraulic and electrical works for Building 1 – essential installations for the building’s functionality and amenities. In further news, temporary power will also be established which will enable the team to proceed with various construction activities efficiently and with adequate resources.

CLICK TO LEARN MORE ABOUT COTTON TREE

The Manning by Mosaic | Milton

Address: 33 Railway Tce, Milton

Apartments: 113, 2- and 3-bedroom apartments over 22 levels

Builder: Mosaic Construction

Sales Status: NEARING SELLOUT – ACT NOW

In encouraging news, Mosaic Construction is aiming to complete detailed excavation of The Manning’s site this month, meticulously preparing for the commencement of forming the core foundations. After this, the team will then apply shotcrete to the excavated perimeter walls, a procedure which will ensure the stability of the building as it rises. Another significant milestone the team is targeting will be the pouring of the ground floor concrete slab and installation of the crane base.

CLICK TO LEARN MORE ABOUT THE MANNING

The Prescott by Mosaic | Toowong

Address: 28 Lissner Street, Toowong

Apartments: 101, 2- and 3-bedroom apartments and Masterpiece Skyhomes over 14 levels

Builder: Mosaic Construction

Sales Status: NEARING SELLOUT – ACT NOW

July was a massive month of excellent headway, with the team completing piling works and capping beam installation, a reinforced concrete beam that connects the building’s piles and ensures a strong and secure base. With the piling works concluded, Mosaic Construction wasted no time pushing ahead with bulk excavation. This critical and massive task will continue throughout August. And to maintain a seamless and aesthetically pleasing environment, the undergrounding of the overhead power lines is also targeted for this month and will see to the safety and reliability of the site’s power supply.

CLICK TO LEARN MORE ABOUT THE PRESCOTT

Lorient by Mosaic | Maroochydore

Address: 88 Duporth Ave, Maroochydore

Apartments: An ultra-luxury collection of 15 half and full-floor penthouse-style residences.

Builder: Mosaic Construction

Sales Status: SOLD OUT

The team continues to make solid strides, having completed the Level 8 concrete slab pour last month. This makes August a critical and exciting month, as the team targets Lorient’s structural building top-out, weather permitting. The interior transformation has now begun to the lower levels, with the first coat of paint applied up to Level 2. The next month will see continued plumbing, wall sheeting, window installation and services rough-in, as well as further advancements in the Recreation Building’s construction.

CLICK TO LEARN MORE ABOUT LORIENT

Luca by Mosaic | Kirra

Address: 7 Douglas Street, Kirra

Apartments: 31

Builder: Mosaic Construction

Sales Status: SOLD OUT

August is a critical month for Luca, as Mosaic Construction targets to achieve Luca’s structural building top-out, weather permitting. Further to this immense milestone, the team will push ahead with external painting and preparation for the scaffold to commence its drop, unveiling Luca’s beautiful, timeless facade as it goes. Additional works for August include prepping for carpet and hybrid timber flooring installation while progressing with glazing installation, wall framing, and sheeting throughout the month.

CLICK TO LEARN MORE ABOUT LUCA

Dawn by Mosaic | Mermaid Beach

Address: Peerless Ave, Mermaid Beach

Apartments: 86

Builder: Hutchinson Builders

Sales Status: SOLD OUT

Having achieved the exceptional milestone of structural top-out, Hutchinson Builders has successfully removed the jump form containment screens, allowing for an unobstructed view of Dawn’s stunning facade. As we move towards the final stages of construction, there will be a significant focus on progressing Dawn’s common areas as well as the targeted completion of the solar panel installation. The hoist and crane are also scheduled to be removed this month.

CLICK TO LEARN MORE ABOUT DAWN

The Witton by Mosaic | Indooroopilly

Address: 29 Finney Road, Indooroopilly

Apartments: 141 over two boutique buildings

Builder: Mosaic Construction

Sales Status: SOLD OUT

The team continues to make solid strides, with preparations underway to resume construction on Witton Two. Glazing installation is also scheduled to begin at Witton One’s lower levels this month.

CLICK TO LEARN MORE ABOUT THE WITTON

Augusta by Mosaic | Burleigh Heads

Address: 4 First Ave, Burleigh Heads

Apartments: 34 2 – and 3-bedroom apartments and sub-penthouses over 13 levels

Builder: Mosaic Construction

Sales Status: SOLD OUT

Mosaic Construction continues to make solid progress, completing the Level 4 concrete slab pour in July and prepping the formwork for level 5. Services rough-in is underway to Level 1, while the waterproofing process for the basement’s tanks and door/window openings were successfully finalised.

CLICK TO LEARN MORE ABOUT AUGUSTA 

Florence by Mosaic | Burleigh Heads

Address: 42 The Esplanade, Burleigh Heads

Apartments: 9 full-floor Masterpiece Series residences over 9 levels

Builder: Mosaic Construction

Sales Status: SOLD OUT

Last month saw Florence’s Level 2 concrete slab pour and the completion of prep work for the Level 3 pour. As Florence and Augusta are adjoining sites, they are being built at the same time. Weather permitting, the team are aiming to pour the Levels 3 and 4 slabs in August, meaning we are approaching Florence’s structural halfway mark.

CLICK TO LEARN MORE ABOUT FLORENCE

Bianca by Mosaic | Bilinga

Address: 1 Surf Street, Bilinga

Apartments: 13, 3-bedroom Masterpiece Series residences over seven levels

Builder: Mosaic Construction

Sales Status: SOLD OUT

July was an incredibly productive month for the team. Most significantly, it saw them achieve the massive and exciting milestone of Bianca’s official structural top-out. Wall framing is complete to Levels 3 and 4, while the initial rough-in of services is up to Level 5. Energex has completed Bianca’s permanent electricity connection, with external painting, tiling, joinery installation and wall sheeting underway in August.

CLICK TO LEARN MORE ABOUT BIANCA

The Mowbray by Mosaic | East Brisbane

Address: 73 Northcote Street, East Brisbane

Apartments: 81, 2- and 3-bedroom residences over 8 levels

Builder: Mosaic Construction

Sales Status: Only a couple remaining – move quickly.

The team completed bulk excavation and the application of shotcrete to the basement walls last month, with The Mowbray’s tower crane also sitting proudly in the sky. Weather permitting, August is also set to be another momentous month, with the first basement concrete slab pour taking place. And underscoring our commitment to sustainable outcomes for our Residents, the community, and the environment, we are proud to be one of the first developers in South East Queensland to pioneer the use of Holcim’s ground-breaking ECOPactZero carbon-neutral concrete in The Mowbray.

CLICK TO LEARN MORE ABOUT THE MOWBRAY

Marella by Mosaic | Broadbeach

Address: 146 Surf Parade, Broadbeach

Apartments: 100, 2- and 3-bedroom residences over thirty levels

Builder: Mosaic Construction

Sales Status: Sold Out

Following Marella’s successful jump form installation, the team managed to jump an impressive three levels last month. The best thing about this construction method is that as Marella continues to rise, its stunning facade will unveil progressively for all to see. August sees the team continue to fire on all cylinders, targeting the completion of the Mezzanine and Level 1 concrete slab pours and commencing the formwork in preparation for the Level 2 concrete slab pour.

CLICK TO LEARN MORE ABOUT MARELLA