Building address
The registered council address is your apartment number, 17 The Esplanade, Maroochydore, QLD, 4558
Electricity
Your building has an embedded electricity network, which means that your building purchases its electricity in bulk. This arrangement reduces network charges by aggregating all electrical meters through one metering point that is directly connected to the main electricity network, thus providing a competitive energy rate to all residents.
Apartments retain their own individual meters, so residents are charged only for their usage, in addition to standard supply charges.
If you are engaging the services of Mosaic Property Management, connection instructions will be provided to your tenants directly.
For external managements, please ensure your property manager is provided with the necessary information in relation to arranging electricity connection, so that they can advise your tenants accordingly.
Activation of your energy account is necessary from settlement day, regardless of occupation date. If an account is not registered, a placeholder Occupant Account will be created for which you will incur back charges, possibly at a higher rate. Connection instructions will be provided in the lead up to settlement.
Please note that under an embedded electricity network, you are required to sign up with the building’s provider however, the supply rates are lower than what you would obtain under a retail arrangement.
Water
Each apartment has separate hot and cold-water meters and will be individually charged for usage.
Hot water at Cotton Tree is delivered via an electric instantaneous water heating system, which provides an immediate and continuous flow of hot water. Designed for efficiency, the units do not store water, avoiding potential heat losses that occur in traditional storage hot water systems. Having the unit located within your apartment reduces time lags, saving residents both water and energy.
Your cold-water usage will be calculated and charged to you by Unity Water. They will bill you directly with the details provided to them at settlement. You do not need to arrange connection or contact anyone to establish an account. As a general note it is common for the first bill to be sent several months following settlement.
As above, if using Mosaic Property Management, connection instructions will be provided to your tenants.
For those using external property management, please ensure your property manager is provided with the necessary information that will be uploaded closer to settlement.
Internet
Cotton Tree will provide residents with an exceptional building-wide wireless internet experience via Lightning Broadband.
Boasting one of Australia’s most reliable and fastest internet connections, using an innovative mix of optic fibre and cutting-edge fixed wireless technology, Lightning Broadband are offering speeds of up to 1,000Mbps.
With the router already installed and configured, living in a Lightning-enabled home provides:
- Instant activation
- Unlimited data
- Symmetrical upload + download speeds
- Flexible plans – upgrade or downgrade your plan
- No “new development” or activation fees
Further information including onboarding documents, benefits and monthly rates will be provided to tenants by Mosaic Property Management.
For external managements, please ensure this information will be passed on to your tenants.