As we approach the end of the year, our latest construction update highlights the continued progress and significant milestones achieved across all our sites. Mosaic Construction remains focused and committed, ensuring a strong conclusion to 2024 and a solid foundation for the year ahead. Take a closer look at the developments shaping the final stages of this year’s projects.

Sunshine Coast

Cotton Tree by Mosaic | Cotton Tree

Address: 17 The Esplanade, Cotton Tree

Apartments: Two boutique buildings featuring 8 full-floor, ultra-luxurious 3-bedroom residences and 33 spacious 2- and 3-bedroom residences.

Builder: Mosaic Construction

Design Partner: Bureau Proberts

Sales Status: SOLD OUT

Mosaic Construction has made excellent strides in these closing months. Weather permitting, the team is set to achieve the structural top-out for Building 2 (Memorial Avenue) as planned before the Christmas and New Year break.

Interior works at Building 2 are also progressing on schedule. Window installation has reached Level 6, wall sheeting is complete up to Level 4, painting is finalised to Level 3, and joinery installation is underway on Level 2.

Similarly, excellent progress continues at Building 1 (The Esplanade). Window installation is closed out across all levels, tiling and joinery fitting have reached Level 6, stone benchtop installation is at Level 4, plumbing fit-off is completed to Level 3, and timber flooring is being laid on Level 2.

CLICK TO LEARN MORE ABOUT COTTON TREE

Brisbane

The Manning by Mosaic | Milton

Address: 33 Railway Tce, Milton

Apartments: 113, 2- and 3-bedroom apartments over 22 levels

Builder: Mosaic Construction

Design Partner: BDA Architecture

Sales Status: SOLD OUT

Mosaic Construction has made excellent progress in these final months of 2024. Having completed the concrete slab pours for Levels 17 and 18 on schedule, they are targeting completion of both the Level 19 and Level 20 pours in December, weather permitting.

High-level services rough-in is advancing to Levels 12 through 14. Glazing installation is complete up to Level 13, and party walls are complete up to Level 11. Wall and ceiling sheeting and setting are moving through both Levels 9 and 10.

The first coat of paint has been applied on Level 7, where tiling and joinery are also progressing. Flooring preparation is at Level 6.

CLICK TO LEARN MORE ABOUT THE MANNING

The Prescott by Mosaic | Toowong

Address: 28 Lissner Street, Toowong

Apartments: 101, 2- and 3-bedroom apartments and Masterpiece Skyhomes over 14 levels

Builder: Mosaic Construction

Design Partner: DKO

Sales Status: SOLD OUT

In November, Mosaic Construction reach an exciting milestone with the commencement of the planned scaffold drop, starting from the rooftop, where the recreation spaces are taking shape.

Internal fit-outs are progressing rapidly across the building. Levels 1, 2, and 3 residences are now fully completed and secured.

This month, the team aims to have all residences up to Level 7 prepared for their final clean. Meanwhile, joinery installation will advance to Levels 8 and 9, and wall and ceiling sheeting is expected to be finalised up to Level 13.

Continuing the positive progress, the permanent water and sewer connections are now fully installed, along with the successful installation of the permanent power connection.

CLICK TO LEARN MORE ABOUT THE PRESCOTT

The Mowbray by Mosaic | East Brisbane

Address: 73 Northcote Street, East Brisbane

Apartments: 81, 2- and 3-bedroom residences over 8 levels

Builder: Mosaic Construction

Design Partner: DKO Architecture

Sales Status: SOLD OUT

This marks an exciting milestone as we share the final construction update for The Mowbray by Mosiac, with Residents set to move in mid- to late-January 2025.

Mosaic Construction is progressing at a dynamic pace to complete the remaining tasks in the coming weeks.

The current priorities include finalising ground-floor works such as landscaping, completing the rooftop recreation level and common areas, and addressing touch-ups to the external elevations.

Mosaic is genuinely excited to bring this address to life and we couldn’t be more honoured to share this significant moment with you.

CLICK TO LEARN MORE ABOUT THE MOWBRAY

Gold Coast

Isabel by Mosaic | Burleigh Heads

Address: 96 The Esplanade, Burleigh Heads

Apartments: 28 half and full-floor residences and Sky Homes across 16 levels and two split-level penthouses, each with private pool.

Builder: Mosaic Construction

Design Partner: Koichi Takada Architects

Sales Status: NEAR SELLOUT  – ACT NOW

In November, Mosaic Construction successfully completed Isabel’s Basement 2 concrete slab pour as scheduled, along with forming the ramp connecting Basement 2 to Basement 1.

The Basement 1 deck has now been fully formed, and the vertical structures linking Basement 1 to the ground floor are also in place. The team plans to pour the Basement 1 slab early this month, weather permitting.

Once this is complete, the temporary bracing beams will be removed, paving the way for further structural advancements.

In addition, the site accommodation will be relocated to an above-footpath gantry. This move ensures a streamlined and well-organised construction environment as the team shifts focus toward vertical progress.

CLICK TO LEARN MORE ABOUT ISABEL

Lily by Mosaic | Broadbeach

Address: 4 Rosewood Avenue, Broadbeach

Apartments: 98, 2- and 3-bedroom residences and Sky Homes over 29 levels

Builder: Mosaic Construction

Design Partner: Plus Architecture

Sales Status: SOLD OUT

In November, Lily’s structure progressed to Level 17 as planned, with the jump form advancing to Level 20.

Window and balustrade installation is complete to Level 14, while high-level services are progressing on Level 13. On Level 12, fire-rated party walls are being constructed, and unit framing is underway on Level 11.

Service rough-ins are ongoing on Level 10, with sheeting now complete on Level 9. Level 8 has reached the set and sand stage, and carpentry work is in progress.

The initial paint application has started on Level 7, with waterproofing advancing on Level 5. Wet area tiling is also progressing on Level 4.

Floors are being prepared and levelled on Level 3, and joinery installation is underway on Level 2.

Mosaic Construction aims to maintain strong momentum throughout December, with a goal to complete the tower structure up to Level 19.

CLICK TO LEARN MORE ABOUT LILY

Marella by Mosaic | Broadbeach

Address: 146 Surf Parade, Broadbeach

Apartments: 100, 2- and 3-bedroom residences over thirty levels

Builder: Mosaic Construction

Design Partner: Plus Architecture

Sales Status: SOLD OUT

Mosaic Construction has made excellent strides in these closing months, marked by the recent removal of Marella’s tower crane and builder’s hoist.

The Level 1 common areas are taking shape beautifully. Painting has concluded, and the gym flooring, sauna, and steam room base fit-outs are finalised.

The BBQ area and pool shell are complete and ready for their next stage, while lobby tiling and painting across Level 1 are also finished. Additionally, the mezzanine planter works are fully prepared and ready for the upcoming plant installation.

Critical infrastructure works have been closed out at the ground-floor level, including the stormwater tank and the pool plant room.

Ground-floor lobby windows are installed, and the upper ground-level car park is fully completed.

Internally, all wall and ceiling sheeting, setting, and sanding are complete. Waterproofing is underway on Level 28, while floor preparation progresses on Level 27.

Joinery installation is advancing on Level 26, and stone and flooring work is ongoing on Level 24. On Level 23, service fit-off is in progress, and the final paint application has begun on Level 22, bringing the interiors closer to the end.

Mosaic Construction will maintain strong momentum throughout December and January, with completion anticipated for mid- to late-February 2025.